# io.github.theluckystrike/change-order

Change orders against a quote or work order: deltas, approval, running contract value.

- **Type:** MCP server
- **Trust:** 10/100 (F), scored on the remote rubric — Limited: the scan came back clean but coverage was partial, so the score sits below what full coverage would allow. Nothing was found.
- **Verification:** community-indexed — nobody has claimed this listing
- **Version:** 0.22.0
- **Author:** io.github.theluckystrike
- **License:** Unknown
- **Endpoints:** streamable-http https://mcp.zovo.one/mcp/change-order
- **Source:** https://github.com/theluckystrike/mcp-servers
- **Endpoint health:** reachable (last checked 2026-09-26T13:02:37.913Z, 3 samples) — uptime is not a security property and is not part of the trust score
- **Compatible clients:** claude-code, cursor, copilot, chatgpt, gemini (basis: transport)

## Trust

10/100 (F), scored on the remote rubric — Limited: the scan came back clean but coverage was partial, so the score sits below what full coverage would allow. Nothing was found.
- Publisher verified: no
- Install scripts: not scanned
- Prompt-injection scan: not run
- Obfuscation scan: not run

## Security scan

Not scanned. This is a coverage gap, not a clean result — Forge asserts nothing about this entry's security posture.

## Tools

Tool surface: not scanned yet — tool surface unknown.

## Install

**Verdict: review** — Installable, but 2 things to check first: Forge has not scanned this entry, so nothing is known about its contents either way.
**Cautions** (coverage gaps and advisories — never blocking)
- Forge has not scanned this entry, so nothing is known about its contents either way.
- No publisher has proved control of this listing; it is indexed, not vouched for.
**Config** (claude-code):
```json
"{\n  \"mcpServers\": {\n    \"change-order\": {\n      \"type\": \"http\",\n      \"url\": \"https://mcp.zovo.one/mcp/change-order\"\n    }\n  }\n}"
```
**Credentials it will ask for** (names only — Forge never holds a value):
- `MCP_LICENSE_KEY` — Mcp License Key (optional)
Placeholders only. Forge never holds, brokers, or transmits a credential value — replace each <YOUR_NAME> in your own config file. Do not send a value back to Forge; no Forge endpoint accepts one.
- This entry needs 1 credential (0 required). The generated config carries placeholders, so it will fail in the editor rather than at runtime if they are left unset.

## Blast radius

Contained to critical — not scanned yet — tool surface unknown. Known so far: holds an api key; runs on someone else's infrastructure.
- Floor 16, ceiling 72 (tier: unknown)
- `unknown` means the floor and ceiling land in different bands — not measured enough to name one. It does not mean low.
- This is impact, not likelihood. A high radius is not a defect: a filesystem server is supposed to write files. It is never part of the trust score.

## Machine-readable views of this entry

- Signed JSON: https://forgeregistry.com/api/v1/packages/io.github.theluckystrike%2Fchange-order
- Install plan: https://forgeregistry.com/api/v1/packages/io.github.theluckystrike%2Fchange-order/install-plan
- Alternatives: https://forgeregistry.com/api/v1/alternatives/io.github.theluckystrike%2Fchange-order
- HTML page: https://forgeregistry.com/registry/io.github.theluckystrike%2Fchange-order
- MCP: POST https://forgeregistry.com/api/mcp → `forge_get_package` / `forge_install_plan`

## About this document

Generated by Forge (https://forgeregistry.com) — a compact rendering of the same record served, signed, at the JSON URL above. Trust and scan facts are the registry's own measurements; anything Forge did not measure is named as unmeasured rather than omitted.
