Don't bring infrastructure (CI, signing, notarization, monitoring, release scripts) to ship-quality before its lack is actually causing problems; premature polish costs both the time and the rigidity of a recurring maintenance obligation. Polish when the lack of polish is the limiting factor, not be
Don't bring infrastructure (CI, signing, notarization, monitoring, release scripts) to ship-quality before its lack is actually causing problems; premature polish costs both the time and the rigidity of a recurring maintenance obligation. Polish when the lack of polish is the limiting factor, not before. Load when about to add CI / signing / monitoring before the thing being shipped has stabilized